How to compare landscaping quotes

The short answer

Give every company the same written brief, then compare quotes line by line, not by the total. The usual differences are the sub-base and drainage, waste removal, the grade of materials and VAT. Link payments to stages and never pay most of the price upfront.

On this page
  1. Give everyone the same brief
  2. The line-by-line checklist
  3. Where quotes usually differ
  4. Deposits and stage payments
  5. Before you sign
  6. Common questions

Two quotes for "a 25 m² patio" can be thousands of euro apart and both be fair, because they describe different jobs. The aim isn't to find the cheapest number; it's to make sure you're comparing the same work.

Give everyone the same brief

Write a short brief and send it to each company before their site visit: what you want built, rough sizes, the materials you have in mind, your budget range and when you'd like it done. Ask each to quote against it, and to list anything they'd change and why.

The line-by-line checklist

ItemWhat to check
Area and layoutSame m², shape and levels on every quote
ExcavationDepth dug out, and who takes the spoil away
Sub-baseType and depth of compacted hardcore
DrainageFalls away from the house, channel drains, soakaways
MaterialsExact paving, fencing or decking product and grade
Edging, steps, wallsIncluded, and specified
WasteSkips, tipping fees and a waste collection permit
Making goodRepairing lawns, beds and access routes afterwards
VATIncluded or not
TimingStart date, duration and what happens in bad weather
GuaranteeWorkmanship guarantee, and materials warranties

Where quotes usually differ

Groundwork. The sub-base and drainage are invisible once a patio is laid, which is exactly why they get cut on cheap quotes. In Cork's wet climate, a patio without proper falls or drainage holds water and moves.

Waste. Digging out a garden produces tonnes of soil. Removing it costs money, and anyone taking it away needs a permit.

Materials. "Indian sandstone" and "porcelain" cover a wide range of grades. Ask for the product name, or see a sample.

Access. Without side access, materials and waste go through the house or over it. One company may have priced for that; another may not have noticed.

Deposits and stage payments

A deposit to cover materials ordered for your job is normal. After that, link payments to stages, for example groundwork complete, paving laid and final completion, and keep back the final payment until you're happy with the finished job. Pay by traceable methods against invoices.

Before you sign

  • Check whether the work needs planning permission and, on a shared boundary, your neighbour's agreement.
  • Get the final scope, price, payment stages and start date in writing.
  • Ask for proof of public liability insurance.
  • Ask to see a similar project they've finished, ideally in Cork.

Find landscapers in Cork, or check typical landscaping costs.

Common questions

How many landscaping quotes should I get?

Two or three, from companies that have seen the site. Fewer gives you nothing to compare; more takes a lot of everyone's time.

Why are landscaping quotes so different?

Usually because they describe different jobs: a different sub-base depth, drainage, waste removal, paving grade or VAT treatment. Line them up item by item before comparing totals.

How much deposit should a landscaper ask for?

A deposit to cover materials ordered specially for your job is reasonable. Avoid paying most of the price upfront; link payments to stages of work.

Should a landscaping quote include VAT?

It should say clearly whether VAT is included. A VAT-registered company must charge it; a smaller unregistered one won't.

Sources

See how we research and check our guides.

Gardeners and landscapers in Cork

See all businesses